Track Down on the Upper Section of Stowey Green

I have arranged and glued the track for the removeable section of Stowey Green, the track has been wired and holes drilled for the 3 points on the board.

Next job is to tidy up the wiring and attach it to the terminal block, and of course attach the point motors.

I have added the station halt and goods shed to show how the section works,