I have arranged and glued the track for the removeable section of Stowey Green, the track has been wired and holes drilled for the 3 points on the board.
Next job is to tidy up the wiring and attach it to the terminal block, and of course attach the point motors.
I have added the station halt and goods shed to show how the section works,